Metro

Airport–Bharat Future City metro

A 39.6 km corridor moved to a proposed Phase III.

Current status

Proposed

A 39.6 km corridor moved to a proposed Phase III.

Status checked 21 Sep 2026

Status history

Proposed21 Sep 2026

A 39.6 km corridor moved to a proposed Phase III.