Current status
Proposed
A 39.6 km corridor moved to a proposed Phase III.
Status checked 21 Sep 2026
Status history
Proposed21 Sep 2026
A 39.6 km corridor moved to a proposed Phase III.
Metro
A 39.6 km corridor moved to a proposed Phase III.
A 39.6 km corridor moved to a proposed Phase III.
Status checked 21 Sep 2026
A 39.6 km corridor moved to a proposed Phase III.