Flyover

Bachupally flyover

A 1.3 km, six-lane flyover opened in June 2026.

Current status

Operational

A 1.3 km, six-lane flyover opened in June 2026.

Status checked 21 Sep 2026

Status history

Operational21 Sep 2026

A 1.3 km, six-lane flyover opened in June 2026.