Current status
Operational
A 1.3 km, six-lane flyover opened in June 2026.
Status checked 21 Sep 2026
Status history
Operational21 Sep 2026
A 1.3 km, six-lane flyover opened in June 2026.
Flyover
A 1.3 km, six-lane flyover opened in June 2026.
A 1.3 km, six-lane flyover opened in June 2026.
Status checked 21 Sep 2026
A 1.3 km, six-lane flyover opened in June 2026.