Flyover

Kothaguda multi-level flyover

A 2.21 km link opened in January 2023.

Current status

Operational

A 2.21 km link opened in January 2023.

Status checked 21 Sep 2026

Status history

Operational21 Sep 2026

A 2.21 km link opened in January 2023.