Metro

Metro Phase II: MGBS–Chandrayangutta (Old City)

A 7.5 km corridor with works on the ground.

Current status

Under construction

A 7.5 km corridor with works on the ground.

Status checked 21 Sep 2026

Status history

Under construction21 Sep 2026

A 7.5 km corridor with works on the ground.