Paradise–Dairy Farm elevated corridor (NH44)

A 5.4 km elevated corridor with a 36-month timeline.

Current status

Under construction

A 5.4 km elevated corridor with a 36-month timeline.

Status checked 21 Sep 2026

Status history

Under construction21 Sep 2026

A 5.4 km elevated corridor with a 36-month timeline.